• Products
    • Seismographs
    • Magnetometers
  • Rentals
    • Rental Rates
    • Rentals Contact Form
  • Solutions
    • Engineering and Infrastructure Applications
    • Oil and Gas Exploration
    • Mining and Mineral Exploration
    • Geologic & Research Investigations
    • Environmental/Ground Water Studies
    • UXO Detection
    • Archaeology
    • Security and Detection
    • Orphaned Well Cleanup
  • Software
  • Resources
    • Geoelectrical
    • Magnetic
    • Seismic
  • Support
    • Community Forum
    • Troubleshooting and Theory FAQ
    • Return Material Authorization
    • Support Contact Form
    • Terms and Conditions
  • Company
    • Our History
    • Staff
    • Our Network
    • Careers
  • Contact
  • Forum
  • Payment
  • Forums
  • Members
  • Recent Posts
Forums
Search
 
Notifications
Clear all

Search result for:  id10=WA 0859 3970 0884 [[HATIGA]] Order List Molding Kayu Terpercaya Baturetno Wonogiri

 Search Phrase:
 Search Type:
Advanced search options
 Search in Forums:
 Search in date period:

 Sort Search Results by:


Page 1 / 2 Next
Why does data transfer through WiFi become slow?
Hardware
Rui Zhang
2 years ago
24 Relevance
If the system has a large amount of survey data, it may affect the data transfer rate. Sometimes a very slow SD card makes the system unresponsive; to the user this can look like a slow/bad network connection. Therefore, it might be useful to clean up the SD card and USB drive. Delete the Geometrics.log file on the USB drive. Clean up the survey data on the SD card: First, make sure that you have all the data that you need off of the SD card. Either download all survey data that you want to keep, or copy all of the contents of the SD card to another drive (perhaps to a PC). Delete all of the data on the SD card, doing one of the following: Use the UI to delete all of the surveys, then use the "Clean old files" button on the Admin page to empty the recycle bin on the SD card. This can be VERY slow, and because the MagArrow has a very simple web interface, the user will get no useful feedback. On a very full SD card, this process might take 30 minutes or so. Or.... Remove the SD card from the MagArrow and after copying any data that the user still hasn't saved to a PC, format it or delete everything on it, then re-insert it. Be careful not to lose the SD card or to let it drop into the inaccessible spaces in the instrument. If you format the SD card, the ExFAT format is preferable. If the customer can't get the data downloaded from the instrument (takes too long or stops), the data can be imported into a survey in Survey Manager, directly from the SD card (or from the PC hard drive to which the SD card data has been copied). Then the SD card can be cleaned up or formatted. With the new version of Survey Manager (you need to update that also, not just the instrument software), the user can import a large survey, including all of the files in subdirectories, by selecting the "acquinfo.txt" file in the root directory of the survey, from the SD card. More details about how to import/export SD card files using Survey Manager can be found in the post below: SD card files conversion
View entire post
Channel remapping in SGOS
Software
Gretchen Sch...
3 years ago
10 Relevance
Channel Remapping Channel remapping allows you to change: the Order of channels on each analog spread cable that connects to the Geode reorder the Geode boxes. You would use this option if your cables were wired opposite to the default Order normally used in Geometrics wiring, if you wished to turn your line around to have the low channels at the opposite end, or if your cables had a wiring error. Channel remapping is also often necessary when using more that a single network cable. Default cable wiring of Geometrics seismographs Default Order is defined as the natural electrical Order in which channels are oriented when the system first powers up before remapping. Refer to Section 3 under Connector Wiring that discusses standard wiring configurations. You may have requested a custom wiring configuration from Geometrics. If you are confused about your wiring, contact the factory and refer to the serial number and job number. Geode cables are typically wired in a ‘high-side configuration’, meaning that the Geode connects closest to the highest numbered channel on the analog cable. The 149 figure above shows this configuration for a single box system, with 24 channels. Multiple Geodes The following diagram shows a default single digital line (one network card) system with 3 Geodes. Note that Geode one is always closest to the controller in a default configuration. Multiple Network Lines The next diagram below shows a default configuration with two digital lines (two network cards) with the controller positioned in the middle. Line 1 is on the left and line 2 is on the right. One might use two lines to increase data throughput to reduce time between shots. Like the configuration above, the Geodes are numbered starting closest to the controller. The seismic controller software labels all of the channels contiguously even though they are on two separate digital lines. However, if the lines are collinear, the first line will have the channels Ordered backwards. This can be easily rectified with the remapping feature. There are two ways of remapping channels: automatic mode and manual mode. Automatic mode settings are Listed on the top of the remapping dialog box, and manual mode on the bottom. Automatic Channel Remapping Automatic channel remapping allows you to reverse either the Order of the Geodes on the line, or reverse the Order of the channels on the spread cable. The above diagram shows the result after both channels and Geodes have been reversed, renumbering the line so that low channels start on the left hand side and increase towards the right. In the dialog box, the automatic remapping boxes referencing line 2 remain unchecked, since the default orientation on line two was correct. Manual Channel Remapping Channels can be remapped on an individual basis using the Manual Map Mode. Select the appropriate check box, and enter the Order in which you would like the channels that differs from the default Order. You can specify individual channels separated by a comma (1, 3, 4, 6 etc) or a range of channels (1-13, 24-14 etc). For example, if you wanted the channels Ordered backwards on a 24-channel system, you would enter 24-1. If you wished to reverse the Order of channels 1- 12 in a 24 channel system, you would type 12-1, 13-24. Other examples are shown opposite, and are available by pressing the See Examples button on the remapping menu.
View entire post
How do you convert a Geode from 2D to 3D use?
Hardware
Gretchen Sch...
3 years ago
7 Relevance
1. Hook up Geode in normal configuration to computer Ethernet box. 2. Select Start New Survey. 3. Uncheck Line Tap. 4. Uncheck Aux. 5. Select YES to all pop up menus. 6. Locate lower left corner menu: Seismodule List Window. 7. Note what current loader version under LDVER column of table in Seismodule List Window. (Ex. 2.729) 8. In Order to change the LDVER, you must first set up the table in column F from N/A to X by doing the following: 9. Select System pull down menu from the upper task bar. 10. Select Test. 11. Select Update System Board Bios. 12. Select I Agree. 13. Select Browse. 14. To set up table to enable loader version update (LDVER) select the file: GEODEFOR3D-1.0.exe. 15. Select Open. 16. Select Start Burning. 17. Select Yes. 18. Cycle power or shut down controller by using the software. 19. Restart the Geode. 20. Repeat necessary steps to get to Seismodule List Window. 21. Verify value in column is now X. 22. Select System pull down menu from the upper task bar. 23. Select Test. 24. Select Update System Board Bios. 25. Select I Agree. 26. Select Browse. 27. Select from Flash Update File Flash3_703&2_42.exe. 28. Select Start Burning. 29. Select Yes. 30. Verify Power LED light on Geode now blinks 3 seconds on 1 second off. 31. Select OK. 32. Cycle power or shut down controller by using the software.
View entire post
New order registration/transfer explanation
SeisImager Software
Randl Rivera
2 years ago
6 Relevance
I have attached the instructions that are sent with a new Order acknowledgment. (Installation and Transfer) The license is assigned to a specific Registration ID once fully purchased. This ID can be assigned to a person (we like to know for our own records) if possible but not required and can be transferred to other PC’s as needed. The ID works like a softkey dongle. The software can be active on only one machine at a time. I attached a simplified “Steps with windows_SI Transfer procedure that shows how the software can be moved. The PC must connected to the internet to affect the first part of the transfer (which removes the ID from the PC, making available for the next). Then to place the Reg ID on the next computer is just following the original registration process. Do not lose the ID. Make sure that the ID has been removed before a disc is reimaged or an employee leaves with the PC. If for some reason the Reg ID has to be reset, (computer dies before the ID can be removed) I will require a statement and an end user then for my records. I am available to discuss if needed at the number below 0700-1500 PST. Best, RandL P RiveraCustomer Service Repair Supervisor+1 (408) 428-4254 (direct)+1 (408) 954-0522 (office)support@geometrics.com Attachment : SeisImager_LicenseTransfer_Instructions_v1.2.pdf Attachment : Steps with windows_SI Transfer.pdf Attachment : SeisImager_Installation_Instructions_v7.6.pdf
View entire post
What Fluid can I use in my Geometrics Proton Precession Magnetometer?
Hardware
Gretchen Sch...
3 years ago
4 Relevance
List of approved fluids is as follows: n-Decane Shell Sol-71 (Shell oil product) Isopar-G (Exxon oil Co.) Odorless mineral sprits (Naptha) Mineral Spirits (Naptha) Charcoal Lighter Fluid Kerosene lamp oil Kerosene Mineral Oil (medicinal Grade) Diesel Fuel (may degrade diaphragm on marine systems) Camp Stove fuel White Gas Unleaded gas The preferred fluids are items 1-7 above. Items 3 & 4 are not the same as paint thinner. Paint thinner will damage the sensor coils, as will Acetone, and should not be used. Items 11 - 13 have a very low flash point and should be used with extra caution, although any petroleum product must be handled carefully. There are several Alcohols which will produce an acceptable signal, but will tend to absorb water. This will degrade the performance of the sensor over time. These should be replaced as soon as possible with an alternate fluid from the above List. Usable alcohols: Ethanol (Grain Alcohol) at least 190 proof Methanol (wood alcohol) Denatured Alcohol (ethanol made poisonous) All of these fluids must be as clean as possible to ensure that no water or contaminates (rust) are in them. Use a filter to make sure the fluids do not contain rust from the storage container.
View entire post
Is it possible to extend the cables between the MFAM sensors and module?
Hardware
Gretchen Sch...
3 years ago
4 Relevance
The cables between the sensors and the MFAM module are flexible circuit boards, and the length is limited to 20 inches. It is possible to remove the MFAM module from the Development kit box and then reconnect it using a ribbon cable. That would allow you to extend the MFAM module and sensors away from the Dev Kit box. Our engineers have tested it to 4 meters. Below are some details about the ribbon cable. The connector on the MFAM unit is Samtec FSH-110-04-F-DH. Its mating connector is Samtec SFMH-110-02-L-D-WT. The easiest option for an extender cable between the MFAM and the Dev Kit is a pair of cable assemblies from Samtec www.samtec.com which has male/female mass terminate connectors put onto a ribbon cable.  These connectors plug directly into the MFAM I/O connector and also into the Development Kit.  We are comfortable with lengths to 10 feet total.  The samtec P/N for this cable is:  FFMD-10-T-60.00-01-F-N The ‘60.00’ number specifies the cable length in inches (which equals 5 feet).  We have found that there is generally a 2-4 week lead, time since they are made to Order and not an off-the-shelf part. (There is another solution as well if you want to make adapter boards at each end (Dev Kit and MFAM).  The exact Samtec mates for the MFAM / Dev Kit connectors are made in PCB mount connectors only, so if you make simple small adapter board to adapt the samtec connector to another connector of your choice.  We've done this with ExpressPCB which is fast and inexpensive.  A board set from ExpressPCB is about $70 including shipping.  Our Engineering Team has a design and parts List they can send you if you're interested in going this route.)
View entire post
Geode SGOS Timing
Software
Gretchen Sch...
3 years ago
3 Relevance
The time associated with each data point in a SEG-2 data file generated by a Geode is related to the time of the “trigger” event which was instrumental in the production of the file and its content. The Trigger Master and Trigger Distribution The trigger event occurs at the Geode designated within the Controller software as the Trigger Master. Although all Geodes are capable of being Trigger Masters, there must be one and only one Trigger Master in any properly functioning Geode system. The Controller automatically takes care of this requirement when the designation is made by a user, and when the system is established at the time of Controller start-up based on a previous designation (or a default setting in the case of a “new survey”). All other Geodes in the system will have their Trigger Master circuit disabled. A trigger event can be initiated by an external electrical pulse provided to the trigger input connector of the Trigger Master Geode, or by a command sent via Ethernet from the Controller to the Trigger Master (usually for test purposes), but only when all conditions are satisfied to allow data recording. There is also a special trigger initiation situation, called “self-triggering” which will not be discussed further here. Upon acceptance of a trigger event, the Trigger Master will distribute the trigger signal to all Geodes in the system, itself included, via an RS-485 network that resides within the digital interconnect cabling. (Proper termination of this RS-485 network is automatically taken care of by the Controller.) The trigger signal is propagated through the cabling and Geodes at the nominal speed of 70% of the speed of light, or approximately 2.1x10^8 m/sec. The maximum distance of successful propagation depends on a number of factors such as the number of Geodes involved, the noise environment, the quality of the cables, and the acceptable amount of timing uncertainty for the particular application. Distances approaching or exceeding 1km should be given careful attention in this regard. In a 3-D Geode system involving LTUs, each LTU, unlike a Geode, will reconstruct the trigger signal before sending it on, effectively confining the maximum distance issue to each sub-network separated by LTUs. The penalty is an additional delay of about 100nS for each LTU in the route. The External Trigger Circuit The external trigger input is capacitively coupled, with a 2mS time constant, to the midpoint of a resistive voltage divider. The voltage difference between the two ends of the divider constitute a voltage "window", which size is set by the trigger sensitivity parameter and can range from essentially zero at the highest sensitivity, to about +/- 2.5V at the lowest sensitivity. The Geode will trigger (if enabled) if and when the coupled signal exceeds the window, in either direction (i.e., positive or negative going). The signal, after the capacitor, is clamped by diodes to the range between the trigger signal ground and +5VDC. The trigger detector output is disabled when the system is disarmed, during a parameter change, and during a shot, up to the trigger hold-off time after the end of the shot. The trigger hold-off time is a parameter set by the user. Preceding the coupling capacitor (i.e., essentially the node accessible at pin A of the external connector), there is a 3.3K-Ohm pull-up resistor to +5VDC (relative to pin B). Also a fast transient suppressor clamps the input at about +/-14VDC. It is advised that the DC + AC level of any voltage applied to pin A relative to pin B be kept within the range of +/-7V, giving some margin of safety. If a DC voltage somewhat less than +5VDC is applied when the connector is first mated, the instrument may trigger at that moment. But, subsequently, because of the capacitive coupling, it will trigger on the next positive or negative going pulse that exceeds the window level. If the duration of the applied voltage pulse is less than the record length + delay time + hold-off time, then the Geode will effectively be ready to trigger on the same edge of another similar pulse. Sub-sample Synchronization The Geode supports a sub-sample timing synchronization feature used for synchronizing the data acquisition after a trigger event to the distributed trigger signal, so that subsequent time points will be known to within 1/32 (~1/20 at the fastest two sampling rates) sample interval. It does this by increasing the sample interval at the trigger time by 0 to 31/32 of a sample interval in increments of 1/32, so that the first sample after the trigger would represent a time of one sample interval after the trigger event, with a tolerance within 1/32 of a sample interval. The following samples continue from there at the expected intervals. For example, with a selected sampling interval of ¼ mS and a recording delay of 0mS, the first sample in the recorded file for each channel would represent data at 250 to 258uS after the trigger event. This of course potentially introduces a small discontinuity at the time of the trigger, observable depending on the nature of the channel waveform(s). (The zero-phase anti-alias filter will smear the discontinuity into the nearby samples both before and after, consistent with the bandwidth of the filter.) Sub-sample synchronization can be disabled if it is deemed to be detrimental for the particular application, at the expense of losing the 1/32 interval timing accuracy. Timing Errors The principal errors in Geode timing are of two types: those associated with the trigger mechanism and which are static over the duration of the record, and those associated with the time base and which change over the duration of the record. Excluding the trigger propagation delay mentioned above, the trigger timing uncertainty is about 1uS. The known fixed errors have been lumped together and are reported in the SEG-2 file trace headers as channel SKEW. (The actual channel skew is zero, since all channels are effectively sampled simultaneously, but the SKEW value in the header is used as the only place permitting small timing corrections. Note that the SKEW value for every channel is identical.) If the size of this correction is important to the application, the SKEW value should be added to the calculated time points when the data is being processed. The Geode time base has a +/-15ppm stability over temperature (-20C to +70C) and component variations. Thus time drift relative to absolute time and relative to other Geodes is possible. (However, all channels within any Geode enclosure use the same time base, so there is no relative drift between channels in the same enclosure.) Therefore timing uncertainty increases from that existing at the time of the trigger until the time of the next trigger (or end of record). Special Timing Issues Involved with “Continuous” Recording “Continuous” recording is a method that allows unending 100% time coverage with recorded Geode data. It produces a series of time-overlapped records created by the use of a negative time delay set equal to the record length such that each record consists of completed history at the time of the trigger event. This technique circumvents the problem of data transmission overrunning data acquisition. The principle constraint is that the cycle time from trigger to trigger must always be less than the chosen record length. Otherwise, gaps rather than overlap would result. Commonly it is used with GPSderived triggering in Order to provide time-stamping of each trigger event. Upon consideration of the above, it will become clear that the time-stamp associated with a particular trigger event will pertain to the data in the following record, not to the data in the record in which the time-stamp is written. This comes about because the trigger event ends the record. Because there is data overlap between records, the precise trigger point in the following record at which the time-stamp applies can be found by comparison of the data values at the end of the former record with those near the beginning of the subsequent record. The overlapping data will be exactly identical in both records (since they are read from the same memory location, twice). The earliest data in the subsequent record that goes beyond the data of the previous record is the data that is one sample interval (assuming sub-sample synchronization is enabled) past the time-stamp. Note well that this comparison must be made independently for at least one channel of each 8-channel Geode board set, because the discrete time at which data values are written to the memory buffer, relative to the trigger event, is a function of each individual board set in the Geode system. Correct GPS Time-Stamping There are differences between various GPS models that can affect accurate time stamping. The 1PPS signal from a GPS has a “timing edge” and return edge, of which only the former is the true whole-second edge. Some models use a rising edge as the timing edge, some the falling edge, and some have it selectable. Consult the GPS manual to determine the definition of its timing edge. As indicated earlier, the Geode can be triggered on either a rising or falling edge. It is important to insure that the Geode is being triggered on the proper edge in Order to avoid timing that may be a fraction of a second off. This is expanded upon below. Some GPS units provide a very narrow timing pulse, others one that has a nearly 50/50 duty cycle. For the narrow pulse units, almost certainly it is the leading edge (rising or falling) that is the “timing edge”. This case can be easily handled by using the Geode Trigger Hold-off feature. If a 10-second cycle time is desired, set the Trigger Hold-off time to about 9.5 seconds. In this case, there is a very small chance that the very first trigger could occur on the wrong (trailing) edge, but from then on the leading edge will be used as the triggering edge. If the GPS provides a 50/50 duty cycle edge, and it is not alterable, then the Geode by itself could as easily start on the wrong edge as on the correct timing edge, and continue thusly until restarted. For this case, Geometrics can provide a Trigger Timing Interface Box (TTIB) that will correct the situation. The TTIB can be programmed to respond only to the correct edge (rising or falling), change the polarity if needed, and gate through only one of every N 1PPS pulses, where N is programmable. (The TTIB also incorporates an alarm system that can provide a remote alert if a record is missed.) Another potential issue comes from the variations between GPS models of the time that the serial time string (containing the time value of the associated 1PPS) is issued relative to the 1PPS itself. The Geode Controller attempts to pick the correct serial string based on a calculation involving the known record length, the PC times, and the trigger notification message from the Geodes. But if the GPS issues the serial string at an unusual time (and the time has been seen to vary somewhat with a given GPS unit) then it could pick up the incorrect time, off by 1 second. If rare, it can be subsequently detected and corrected during data processing, but if consistent it may not be easily detected. Again, the TTIB can accommodate the situation by only gating through to the Controller PC the string belonging to the gated-through 1PPS pulse. The Controller Serial Input Time Window can then safely be widened to 2 seconds (assuming the cycle time is more than 2 seconds) if need be, to expand the Controller’s search for the string around the calculated trigger time.
View entire post
Do Cesium Vapor Magnetometers Require Calibration
General Magnetometer Info
Gretchen Sch...
3 years ago
3 Relevance
Our cesium-vapor magnetometers do not require periodic calibration in Order to maintain the accuracy as described in our published specification when the instrument is operated within specified environmental ranges. Geometrics cesium-vapor magnetometers are manufactured and tested based on the discoveries and the basic designs of Carian Associates (U.S. Patent 3,071,721). This method of total magnetic field measurement relies upon the measurement of the optical absorption of a particular cesium spectral frequency by the cesium vapor enclosed in a small glass cell. This method is similar to those used in the measurement of atomic emission and absorption frequencies using spectroscopic reference cells. The technique thus relies on well-known fundamental quantum mechanical constants for accurate and precise measurement of the magnetic field. As a result, no adjustments to the sensor are needed in Order to correct or maintain its accuracy and Geometrics sensor and sensor driver electronics are designed to either work correctly or to not work at all and to report both the strength of the magnetic field as well as the strength of the electrical signal produced by the working sensor. In this way, the signal strength measurement provides a direct indication of the operational state of the magnetometer while it is running and serves to alert the operator if the magnetometer encounters environmental conditions that are outside of its operating range. Occasional maintenance of the instrument at Geometrics facility should be performed when the instrument's internal diagnostics indicate substandard performance as described in the operator's manual. Please contact Geometrics Support for technical advice and additional information pertaining to your specific model.
View entire post
Using UART4 to stream data to a Rpi4
Software
Ana Teresa F...
5 months ago
2 Relevance
Hello, I saw in a previous post that the current firmware only supports MFAM streaming via Ethernet, and that UART5 isn't supported. I'm modifying the Dev Kit firmware to add TX output on UART4 instead, by adding a parallel Mailbox_post in spiTaskFxns.c to a new UART4 TX task/mailbox, at 460800 bps. Before going further, I wanted to ask: Is there any hardware-level reason UART4 wouldn't work here, beyond it just not being implemented in the stock firmware? Does the existing SPI→Ethernet pipeline assume a single consumer, in a way that could cause timing issues if I add a second parallel mailbox post for UART4? Has anyone tried UART-based streaming from the Dev Kit before, and if so, any known pitfalls? Thanks in advance!
View entire post
File Cleanup Utility
General Magnetometer Info
Magnetics SW
2 years ago
2 Relevance
Some of the Geometrics magnetometers include a feature, called the "File Cleanup Utility", that removes files that are no longer useful from storage on the instrument. The feature's accessible from the "Support" link in the Settings page in MagNav. You might be reading this post because that page directed you to read this post before using the utility. [This feature is not the same as the feature in MagNav to delete all of a survey's data. That feature removes information only from the database on the Android tablet, and doesn't remove any data in the instrument]. How do I use this feature? If this is the first time you've used this feature, please read the rest of this post before proceeding. Make sure that you're connected via WiFi to the instrument Go to the Settings page in MagNav Select the "Support" link. If your instrument supports this feature, the support page will include a link to "Delete project storage". Tap it. You should see a List of projects, with a name and a "Delete project" button for each project. This feature cleans up the data for all of the surveys in a project. Delete any projects for which you don't want to keep the in-instrument data. You can delete the data for all of the projects that you see, but there's no harm in leaving the files for projects that you're still using. Some projects will show a name similar to this: [c3bd]. These are early projects, in which the user-assigned name was not used in the instrument storage. It's OK to remove the data for these projects. Why do I need to do this? The magnetometers that use MagNav first store data on the instrument, and then sync (or download) the data to MagNav. Some instruments, for which this technical approach makes the instrument more reliable - MagEx, e.g. - do this automatically. Other instruments, such as those that allow disconnected acquisition (e.g. MagStation), store the data until the user re-connects to the instrument and manually starts the sync process. The data stored in the instrument is not of any use once it's been downloaded, but because deletion is slow and for other technical reasons, it's left on the file system in the instrument. As it accumulates, it could eventually interfere with the performance of the instrument and should therefore be deleted. Will this delete any data in the database in MagNav? No, this feature doesn't remove or change any data in the database in MagNav. When should I use this feature? Here are a few guidelines: Run this utility after deleting an entire project. Run this utility after completing a long field survey. Run this utility while doing other instrument maintenance. Run this utility after you've collected "a lot" of data. Run this utility when you have the impression that the instrument is unresponsive or is behaving sluggishly. Will anything bad happen if I forget to do this? Probably not any time soon; the storage systems on the instrument are large and quite efficient. Geometrics tests instruments with amounts of data consistent with several years of regular use, and which show no performance issues relating to file storage performance. But don't let it go forever; follow the guidelines above. Can I delete data for projects that I'm still using? Yes, you can, as long as the data has already been synced to the instrument (that happens manually with MagStation and automatically with the other instruments). Once the data has been synced and is visible in MagNav, its presence in the instrument storage is no longer needed.
View entire post
Takeoff and Landing with a Tethered MagArrow
Hardware
Gretchen Sch...
2 years ago
2 Relevance
The following video shows the correct way to takeoff and land with MagArrow II tethered to the drone. Takeoff and Landing
View entire post
Setting the time on a MetalMapperII tablet
MetalMapper
Magnetics SW
3 years ago
2 Relevance
To set the time on a MetalMapperII Panasonic Toughpad tablet: 1) Using the Applications menu, open a terminal window 2) Set the date and time you want, using the following example as a guide: sudo date -s "2024-02-20 03:25:55 PM PDT" You may need to enter the sudo password (which is the same as the password for the standard "geometrics" user. 3) To change the timezone, use the terminal window to get a List of timezones: ls /usr/share/zoneinfo // To drill into a region, expand the command as follows: ls /usr/share/zoneinfo/Pacific Set the local timezone using this command: // Open the timezone file to edit it. You may need to enter your user password sudo mousepad /etc/timezone // Type in the timezone name, of the timezone you want to use, on a single line in the file, for example like this: Pacific/Guam If you want to see your time in UTC, set the timezone to "Etc/UTC". If you want to set the time in UTC, then when you set the time using the "date" command, use UTC as follows: sudo date -s "2024-02-20 03:25:55 PM UTC"
View entire post
SeisImager/2D Software Packages
SeisImager Software
Randl Rivera
2 years ago
2 Relevance
Very often I am asked what the difference is between the Lite, Std and Pro versions of the 2D Refraction software licenses. SeisImager/2D Software Packages • Standard version: for use on seismograph with mouse or PC with mouse; allows up to 16K samples per trace, 128 traces per shot, 360 traces per interpretation, and 65 shots per interpretation.• Professional version: for use on seismograph with mouse or PC with mouse; allows virtually unlimited input up to 2M samples per trace, 48K traces per shot, 48K traces per interpretation, and 48K shots per interpretation.• Lite version: included with purchase of Geometrics Windows-based seismographs. For use on seismograph with mouse or PC with mouse; allows up to 16K samples per trace, 64 traces per shot, 51 traces per interpretation, and 12 shots per interpretation.• Demonstration version: for use on PC with mouse, may be launched 15 times; same allowances as Lite version; no printing capability.Note: The number of shots per spread and spreads per interpretation are dependent on the actual trace number used. The Standard and Professional versions are also available for rent. SeisImager Software Suite* Refraction & Surface Wave Data Analysis Software 40 hr - $200 75 hr - $300 250 hr- $500. See Rentals - Geometrics : Geometrics and email rentals@geometrics.com to set up an Order.
View entire post
SeisImager installation and registration procedure
SeisImager Software
Kolby Pedrie
2 years ago
2 Relevance
Attachment : New SeisImager Lite registration.pdf Attachment : SeisImager_Installation_Instructions_v7.6.pdf Please see the attached instructions. Registration ID's are typically found on the customer invoice, but can also be found using your Order number or seismograph SN and company name here.
View entire post
MagArrow Export License FAQ
Application
Gretchen Sch...
3 years ago
2 Relevance
The US Department of Commerce category for the cesium-vapor magnetometers Listed in this quotation is ECCN 6A006. It is necessary to obtain a US export license before a magnetometer in this category can be shipping to most countries. If an export license is required, Geometrics Export Administrator will assist you in applying for this license. The export license process takes around 6 weeks, and we are not able to speed up that processes as it is the time the US Government takes to review the export license requests. A license is required for both renting and purchasing the MagArrow, so we are not able to send you the equipment for your use until we receive it. An Export License is NOT required for shipment of cesium-vapor magnetometers to the following countries: Argentina, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, India, Ireland, Italy, Japan, Latvia, Lithuania, Liechtenstein, Luxembourg, Mexico, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Slovenia, Slovakia, South Korea, South Africa, Spain, Sweden, Switzerland, Turkey, and the United Kingdom. (Updated April 2019) Export or re-export of the quoted items to Cuba, North Korea, Iran, Rwanda, Sudan, and Syria is prohibited by the US Dept. of Commerce as these are embargoed countries. The MagArrow-SX is a special version of the MagArrow that has a reduced sensitivity in Order to comply with US regulations and does not require an export license. Please contact us us for more information
View entire post
Page 1 / 2 Next
Share:
Forum Information
Recent Posts
Unread Posts
Tags
  • 94 Forums
  • 233 Topics
  • 332 Posts
  • 1 Online
  • 250 Members
Our newest member: Soren Aalizadeh
Latest Post: STP files for MFAM
Forum Icons: Forum contains no unread posts Forum contains unread posts
Topic Icons: Not Replied Replied Active Hot Sticky Unapproved Solved Private Closed

 Powered by wpForo version 3.2.5


Products

  • Seismographs
  • Magnetometers
  • Rentals

Company

  • Company
  • Careers

News

  • News
  • Events

Contact

  • +1 (408) 954-0522
  • 2190 Fortune Drive
    San Jose, CA 95131 U.S.A.
Privacy Policy
©2026 Geometrics. All Rights Reserved

The wait is officially OVER! 🚀 The ProtonScout is available NOW! Contact sales@geometrics.com to learn more and configure your system today.

Learn About the ProtonScout now!