• Products
    • Seismographs
    • Magnetometers
  • Rentals
    • Rental Rates
    • Rentals Contact Form
  • Solutions
    • Engineering and Infrastructure Applications
    • Oil and Gas Exploration
    • Mining and Mineral Exploration
    • Geologic & Research Investigations
    • Environmental/Ground Water Studies
    • UXO Detection
    • Archaeology
    • Security and Detection
    • Orphaned Well Cleanup
  • Software
  • Resources
    • Geoelectrical
    • Magnetic
    • Seismic
  • Support
    • Community Forum
    • Troubleshooting and Theory FAQ
    • Return Material Authorization
    • Support Contact Form
    • Terms and Conditions
  • Company
    • Our History
    • Staff
    • Our Network
    • Careers
  • Contact
  • Forum
  • Payment
  • Forums
  • Members
  • Recent Posts
Forums
Search
 
Notifications
Clear all

Search result for:  id10=WA 0821 1305 0400 [[Adefa]] Vendor Geotextile Tube Karangasem Bali

 Search Phrase:
 Search Type:
Advanced search options
 Search in Forums:
 Search in date period:

 Sort Search Results by:


Information about Hammer Switches
General Seismograph Info
Gretchen Sch...
3 years ago
12 Relevance
The hammer switch (trigger switch) that Geometrics seismographs use is a contact closure device that utilizes inertia force to create a momentary closure between the center rod and cylinder located in the enclosed device. The delay from strike to closure can vary based on orientation. The black dot on the switch and instructions were added to assist having a repeatable strike to closure time from usage to usage. However, this is only true for one hammer switch. From one hammer switch to the next there could be a variance however very slight indeed. In SCS there is a setting which lets the user change the sensitivity of the hammer switch to accommodate the natural variance in the trigger switches. To build the switch, we use a tool to center the spring beam in the Tube contact, which minimizes the variance in the triggering of the hammer switch between different orientations and natural variations in different hammer switches. Any strike to closure time variance is more affected by the energy of the strike and the momentum produced on the hammer switch. The usage of the black dot to orient the hammer switch for most cases is probably extraneous. We center the beam accurately and suggest the usage of the black spot for mounting repeatability. We left it just to ensure any slight difference due to orientation could be eliminated. Additionally, both the Tube and spring beam are gold plated to reduce and maintain contact resistance. After all this, it depends upon the repeatability of the user’s apparatus.
View entire post
MagMap and Windows11 Issue
Software
Randl Rivera
2 years ago
4 Relevance
Attachment : MagMap_W11.pdf It has been reported that the MagMap software does not work with some versions of Windows 11. The following error is shown: C:\Program Files (x86)\MagMap\olch3d32.dll is not intended for use with Windows or contains an error. Try reinstalling the program from the original installation media or contact your system administrator or software Vendor. Error Status: 0xc000000d Solution: There's a setting in the Windows Security that needs to be changed. See attached.
View entire post
Share:
Forum Information
Recent Posts
Unread Posts
Tags
  • 86 Forums
  • 232 Topics
  • 324 Posts
  • 3 Online
  • 230 Members
Our newest member: Bruno Schiappacasse
Latest Post: How to use SeisImager 2D seismic profiles to be used in real world models
Forum Icons: Forum contains no unread posts Forum contains unread posts
Topic Icons: Not Replied Replied Active Hot Sticky Unapproved Solved Private Closed

 Powered by wpForo version 3.1.1


Products

  • Seismographs
  • Magnetometers
  • Rentals

Company

  • Company
  • Careers

News

  • News
  • Events

Contact

  • +1 (408) 954-0522
  • 2190 Fortune Drive
    San Jose, CA 95131 U.S.A.
Privacy Policy
©2026 Geometrics. All Rights Reserved

Please note that we will be closed from December 22, 2025 – January 2, 2026, in observance of the holiday season.
Normal business operations will resume on January 5, 2026.

The wait is officially OVER! 🚀 The GeodeFlex is available NOW! Write us or contact sales@geometrics.com to learn about our Trade-In Program and configure your system today.

Learn About the GeodeFlex now!